Sunday, May 17, 2015
centering the centersection
Centering the centre section so there is an accurate position for where the cabane wires cross through the cowl cover.
Monday, May 11, 2015
Saturday, May 2, 2015
Bill LeBrun working with Vic Prefontaine, designing cowling over fuel tank and cockpit on Jungmeister
Establishing a centre line and designing cowling so it has the least amount of holes for wires and struts, plus feasible to remove without removing the cabane section and wings....Vic has been imagineering the cowling to completion, once completed in his mind, he will begin manufacturing. April 2015
Bill double checking the cabane section is still centred.
Vic Establishing reference points for cowling over fuel tank.
Bill attaching brackets, which will be used to attach the cockpit cowl.
Subscribe to:
Posts (Atom)